Remodel phase 1A (home addition, excluding quilt shop) punch list:
Living room
- (N/A, phase 2)
Entry
(Us) Salvage hardwood flooring from entryDone!(Us) Install HardiebackerDone!(Rick) Floor tileDone!(Us) Finish painting (around front door)Done!(Us) Finish electricalDone!Wall outlets (2)Done!Ceiling lightDone!
- (Rick) Grout/caulk floor joints
Dining/game room
- (Us) Trim drywall around window
- (Artisan Drywall) Sand down texture in dining/game room
- (Us) Paint
- (Us) Finish electrical
- Ceiling fan (after texture sanding)
- Outlets (3)
- Network/telephone jacks
- Smoke alarm
- (BeautiFloors) Refinish game room floor
Old bathroom Done!
(Moreno Const.) Patch up ceilingDone!- (rest is N/A, phase 2)
Great room
- (Us) Finish electrical
Ceiling fan (after floor refinishing)Done!Reading lights (4)Done!Wall outlets (5)Done!Speaker wiring jacksDone!- Network/telephone jacks
(Rick) Floor tile (continue entryway to back door)Done!(BeautiFloors) Fill in hardwoodDone!(BeautiFloors) Refinish floorDone!- (Rick) Grout/caulk floor joint
Kitchen
(Mike) Demo old kitchen faucet and drainDone!(Mike) Vent new kitchen sink and utility sink (attic work)Done!(Us) Install Hardiebacker (move appliances as needed)Done!(Rick) Install sink & countertopDone!(Rick) Install backsplash (glass tile behind range, ceramic tile elsewhere)Done!(Rick) Install floor tileDone!- (Us) Finish electrical
Garbage disposal and dishwasher wiring — Check for right-angle plugs on both!Done!Countertop outlets (after backsplash tile)Done!- Pendant lights (5)
Wine frig wiringDone!Hood and blower wiringDone!
(Us) Install hood (after glass backsplash tile)Done!(Us) Install range (after glass backsplash tile)Done!(Mike) Finish plumbing — kitchen sink, disposal, dishwasherDone!(Eric) Cabinet/tile trim (baseboards, scribe, etc)Done!(Us) Install dishwasherDone!- (Us) Install wine frig (installed, but I can’t level it until we find the feet)
- (Rick) Replace two cracked skirt tiles, install missed skirting, caulk/grout behind GFCI outlet
Nook Done!
(Us) Install HardiebackerDone!(Rick) Floor tileDone!(Us) Install ceiling fanDone!
Laundry/utility room
(Us) Install switch- and outlet cover platesDone!(Us) Route edges of telecomm backer boardDone!(Us) Paint backer boardDone!(Us) Mount backer boardDone!- (Us) Terminate telecomm wiring
(Us) Install HardiebackerDone!(Rick) Floor tileDone!
New bathroom Done!
(Mike) Bathtub drainDone!(Us) Install HardiebackerDone!(Rick) Floor tileDone!(Rick) Shower/bath surround tileDone!(Moreno Const.) Install medicine cabinetsDone!(Moreno Const.) Install vanities (after floor tile & medicine cabinets)Done!(Mike) Bathtub faucet and shower headDone!(Mike) Install toiletDone!(Mike) Finish plumbing — bathroom sinks, faucetsDone!(Us) Finish electricalDone!Ceiling lights’ switchDone!Exhaust fan switchDone!Sconce lights (4)Done!Vanity outlets (4)Done!Vanity switches (2)Done!
Bedroom hallway
(Us) Install whole-house fan shutterDone!(Us) Finish paintingDone!(Us) Finish electricalDone!Wall outletDone!Lights, switches (3)Done!Whole-house fan controlsDone!Smoke alarmDone!
(Us) Install HardiebackerDone!(Rick) Floor tileDone!(BeautiFloors) Bamboo flooringDone!- (Rick) Grout/caulk floor joint
Caitlin’s bedroom
(Caitlin) Paint closetDone!- (Us) Finish electrical
- Run network and telephone wiring, terminate
Wall outlets (5)Done!Smoke alarmDone!Ceiling fan (after HVAC grills and returns)Done!Install closet lightsDone!
(BeautiFloors) Bamboo flooringDone!(Moreno Const.) Hang closet doorsDone!
Caira’s bedroom
(Caira) Finish painting (2 walls, closet)Done!- (Us) Finish electrical
Wall outlets (5)Done!Smoke alarmDone!Ceiling fan (after HVAC grills and returns)Done!Install closet lightsDone!- Network and telephone jacks
- (Moreno Const.) Adjust bedroom door
(BeautiFloors) Bamboo flooringDone!(Moreno Const.) Hang closet doorsDone!
Garage
- (Us) Finish painting (cutting in, touch-up)
(Moreno Const.) Step(s) for garage/utility room doorDone!(Us) Garage coach lights (2)Done!(Us) Cover ceiling outlets (3)Done!- (Us) Install fluorescent lights (2)
(Us) Garage personnel door light and switchDone!- (Moreno Const.?) Install attic stairs
Attic
(Us) Install attic fans (2)Done!(Us) Verify whole-house fan installation and wiringDone!(Us) Clean up wiring for attic lights and switchesDone!
Exterior
(Alpha Services HVAC) Install AC condensor, wiringDone!(mason) Extend chimney, install counterflashing and chimney cover/spark arrestorDone!(Louis) Install downspouts, re-seal guttersDone!(Us) Paint old front doorDone!- (Us) Doorbell
(Us) Front porch outletDone!(Us) Christmas light outletDone!(Us) Wall outlet on east side of houseDone!(Us) Back door coach lights (3)Done!- (Us) Install louvers for attic fans
- (Mike?) Hose bib on east side of house
- (Mike?) Gas valve for BBQ
- (ACMS?) Re-sweat landscape ball valve so handle operates vertically
(Moreno Const.) Landing and steps for back doorDone!(Us) GFCI outlet for BBQDone!(Us) Redo right side of electrical panel such that door closes smoothlyDone!- (Us) Label electrical panel
- (Us) Paint pop-outs
(Moreno Const.) AC condensor padDone! (Other concrete flatwork is phase 4.)- (Us) Rebuild fence and gate on east side (personnel door behind fence) — phase 4
- (?) New gate for shop driveway — phase 4
Interior finish work
(Alpha Services HVAC) Install grills and returnsDone!- (Us) Door trim
- (Us) Baseboards
- (Us) Window trim
- (Us) Touch-up painting