Our foundation was poured today–woo hoo! Check out our foundation pour photoset on Flickr.
Tag Archive for 'foundation'
Foundation poured
(Also see our foundation photoset on flickr.)
We passed our foundation inspection(s) on the first try. Woot! We’re getting three truckloads of concrete tomorrow morning, and the forms will be removed the following day. Our utility trench will also get backfilled that day. Next week we should be building the floor for the addition and framing Barb’s quilt studio. (It’s on a slab, so the floor will already be done.)
Even though we’re only installing a 225 Amp panel at this time, we had a large conduit installed that will accommodate the beefy cables required for 400 A service in case we choose to upgrade later. This caught the inspector’s eye, and he noted that our Ufer ground won’t be acceptable for 400 Amp service. This isn’t a problem now because we won’t need 400 A service at least until my shop is finished, so I’ll install a 20′ #0 copper ground wire when we pour that slab.
Another remodel update
It’s been a while since I posted anything about our remodeling project, not for lack of progress; rather, it’s been due to a lack of time! So here’s a quick update, text only. (I’ve got lots of photos, but I haven’t had a chance to Photoshop them, or even transfer them from the camera!)