Between Andy, Barb, and me, we got all the walls of the quilt shop sheathed, although I still need to drive some more nails into the middle of the OSB panels. We also need to sheath the gables. Once that’s done, we’ll start working on the roof. Then it’s time to remove all the bracing from inside the shop and start installing the electrical wiring. [Mark Martinelli][] is coming out sometime on Monday to get us a quote for the windows and sliding glass door for the shop.
[Mark Martinelli]: http://www.martinellihomeimprovement.com/