Electrical panels, other remodeling progress

The electrician was out yesterday installing our two electrical panels, the main service panel on the quilt shop and the sub-panel on the house. (Also, Barb and I finished sheathing the west wall of the quilt shop last night.)

100_0754.JPG 100_0753.JPG

[SMUD][] is scheduled to be out on June 6. They’ll take down our overhead power line and pull underground conductors through our conduit to energize the new panel. The unterminated conduits in the pictures above are for telephone and network lines. [AT&T][] will be out on June 1 in the afternoon to put these services underground.

This evening we should finish sheathing the quilt shop. (We got started on the last wall yesterday, but the mosquitoes came out early and in force, so we quit a little early.) Once we’re done with the quilt shop, we’ll start knocking off the remaining rafter tails on the west and north walls of the house.

100_0755.jpg

Our lumber package for the roof should arrive today, and a crew should be out today or tomorrow to get started on the roof. Woo hoo!

Also today or tomorrow, one of the framers should be installing the fascia on the quilt shop. Once that’s done, Barb and I can start sheathing the quilt shop roof.

[SMUD]: http://smud.org/
[AT&T]: http://www.att.com/

About Jim Vanderveen

I'm a bit of a Renaissance man, with far too many hobbies for my free time! But more important than any hobby is my family. My proudest accomplishment has been raising some great kids! And somehow convincing my wife to put up with me since 1988. ;)
This entry was posted in Our home remodeling project, Uncategorized and tagged , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *