Category Archives: Uncategorized

Week 32.5

It’s been about 32½ weeks since construction began on our remodel, and we’re getting down to the finishing touches. We (and our subs) have been pretty busy, which explains the paucity of articles recently. Barb and I have taken a … Continue reading

Posted in Uncategorized | Leave a comment

Paint colors & techniques

Barb thought it might be a good idea to document the paint colors and techniques we’re using, and what better place to do that than the blog? We’re doing a 3-coat process–sealer, primer, and color. The sealer we’re using on … Continue reading

Posted in Our home remodeling project, Uncategorized | Tagged , | 2 Comments

Painting

After nearly seven months of construction, we’re finally starting to paint! The garage, which required the least drywall compound, is ready for painting. Because this is all fresh drywall, we’re putting on two coats of primer–the first one basically seals … Continue reading

Posted in Our home remodeling project, Uncategorized | Tagged , , , | Leave a comment

Another inspection, more drywall work

We have another inspection(s) today–gas pressure test and stucco scratch. The stucco inspection is no big deal, the inspector just walks around looks at the exterior of the house. The gas pressure test is kind of a drag, though. We … Continue reading

Posted in Our home remodeling project, Uncategorized | Tagged , | Leave a comment

Stucco scratch coat

It’s sure handy being one of the few people building or remodeling a home at this point. I called Jack, our stucco subcontractor, yesterday afternoon to see if they could put the first coat on the house now, seeing as … Continue reading

Posted in Our home remodeling project, Uncategorized | Tagged | Leave a comment

Insulation, drywall and HEAT!

Insulation was installed on Wednesday. Wow, what a difference! It’s *quiet*, and the temperature in the house is much more stable. (Not so cold in the morning nor hot in the afternoon.) I thought they were only going to do … Continue reading

Posted in Our home remodeling project, Uncategorized | Tagged , , , , , | Leave a comment

We passed!

We passed frame inspection! Woo hoo! Lots of things are going to happen pretty quickly, now. Insulation goes in tomorrow (Wed). Drywall starts Thursday. Our plumber and HVAC people are also scheduled to be on-site Thursday to hook up the … Continue reading

Posted in Our home remodeling project, Uncategorized | Tagged , , , , , , | Leave a comment

Rough frame re-inspection today

(Update: I forgot to include the pictures. Doh!) It’s been a while since I’ve posted–too busy working on the house to write much about it! The stucco crew was out last week and got the house wrapped and lathed. (And … Continue reading

Posted in Our home remodeling project, Uncategorized | Tagged , , | Leave a comment

Inspection woes

Normally I’m very supportive of the Sacramento County Building Department. Nearly everybody I’ve dealt with has been helpful, professional, and even pleasant. On top of that, the inspector who’s assigned to our job is outstanding. But he must be on … Continue reading

Posted in Our home remodeling project, Uncategorized | Tagged , , , | 1 Comment

39 days til Thanksgiving

Barb took a couple of well-earned days off from our remodel and went to the [Pacific International Quilt Festival](http://www.quiltfest.com/activities.asp?id=7) with my mom on Friday and Saturday. But I wasn’t working alone–J and Andre did a bunch of work for me … Continue reading

Posted in Our home remodeling project, Uncategorized | Tagged , | 1 Comment